The optimal operation of an electrical power supply subsystem results from respect for the effectiveness criterion for the control of an industrial enterprise. It is essential for the operation of the Váh Cascade hydro power plants - a significant Slovak hydro-energy system. The fundamental principle of this operation is the potential hydropower utilization of water courses in addition to planning the control of the whole electrical system. and Obsahuje seznam literatury
The water structures Hričov - Mikšová - Považská Bystrica are a group of channel hydro power plants (HPP) on the Váh Cascade. Modelling methods verified on other channel hydro power plants are easily applicable in their case. In 2006 were by our department provided terrain measurements and hydraulic research on these water structure systems. The results of measurements were used for the better calibration of hydro dynamical model of these power plants. The presented paper describes this process. This work was supported by Science and Technology Assistance Agency under the contract No. APVT-20-046302.