Due to changes at the Gabčíkovo Water Structure‘s Provisional Rules of Operation developed in 2011 at Slovenské elektrárne Inc. - Hydro power plants Trenčín enterprise, a new hydromodel for operating the Gabčíkovo Water Structure was implemented. This hydromodel is capable of planning and exploiting the regulatory functions of the Gabčíkovo Water Structure more effectively than it was previously. The new hydromodel additionally incorporates a simulating model of flow transformation downstream of the Gabčíkovo Water Structure, which will examine the substantiality of Gabčíkovo Water Structure projected operation for compliance with nautical parameters downstream the Gabčíkovo Water Structure. and Obsahuje seznam literatury
The water structures Hričov - Mikšová - Považská Bystrica are a group of channel hydro power plants (HPP) on the Váh Cascade. Modelling methods verified on other channel hydro power plants are easily applicable in their case. In 2006 were by our department provided terrain measurements and hydraulic research on these water structure systems. The results of measurements were used for the better calibration of hydro dynamical model of these power plants. The presented paper describes this process. This work was supported by Science and Technology Assistance Agency under the contract No. APVT-20-046302.